You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Along the lane and down the bend towards wilmslow

Reported via mobile in the Slurry or Mud on the Highway category anonymously at 16:00, Fri 29 November 2024

Sent to Cheshire East Council less than a minute later. Council ref: 6801285.

The mud covers the whole road and is making it very slippy, wagons leaving the work site not clearing wheels and arches and the loads aren’t covered dropping debris on the road also

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for contacting Cheshire East Highways.  Your enquiry has been logged and passed to a member of our team. We will aim to assess and update your enquiry within 20 working days. As your enquiry progresses you will receive further updates.

    Posted by Cheshire East Council at 16:00, Fri 29 November 2024

  • The enquiry has been assessed and does not present a risk to highway users at this time.

    We deal with defects based on the level of immediate risk. We keep all Cheshire East adopted roads and highway assets safe through our routine safety inspections. All inspections are conducted in line with our Code of Practice for Highway Safety Inspections which is available on our website via the link below:
    https://www.cheshireeast.gov.uk/ pdf/ highways/ code-of-practice-for-highway-safety-inspections/ highway-inspection-code-of-practice-april-2021.pdf

    If anything is identified as a risk during a future inspection, we will take action as appropriate.

    State changed to: No further action

    Posted by Cheshire East Council at 15:10, Wed 4 December 2024

This report is now closed to updates from the public. You can make a new report in the same location.