You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

From the end of St Chads Close along Valebrook Drive across Main Road up to Moss Bank Wybunbury CW5 7LU-T

Reported via mobile in the Slurry or Mud on the Highway category anonymously at 07:29, Saturday 5 October 2024

Sent to Cheshire East Council less than a minute later. Council ref: 6553777.

A work vehicle has been parked repeatedly at the end of St Chads Close Wybunbury CW5 7LU over weekends and sometimes during the week for over a month now. The truck is one of two usually left there and is parked dangerously as well as obstructing the pavement. There is now slurry what appears to be asbestos or cement on the road surface in a trail from the truck at St Chads Close to Moss Bank and the road is damaged. It belongs to Cheshire Fences 01270 416370 as they are also illegally advertising using signage on the main road. The trucks left here do not look roadworthy or safe. There is also broken glass by the truck that appears to be part of a mirror. We put up with this for a while but now our patience is gone. Especially with damage to the road surface which might now be permanently discoloured or damaging to health.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for contacting Cheshire East Highways.  Your enquiry has been logged and passed to a member of our team. We will aim to assess and update your enquiry within 20 working days. As your enquiry progresses you will receive further updates.

    Posted by Cheshire East Council at 07:29, Saturday 5 October 2024

  • The enquiry has been assessed and does not present a risk to highway users at this time.

    We deal with defects based on the level of immediate risk. We keep all Cheshire East adopted roads and highway assets safe through our routine safety inspections. All inspections are conducted in line with our Code of Practice for Highway Safety Inspections which is available on our website via the link below:
    https://www.cheshireeast.gov.uk/ pdf/ highways/ code-of-practice-for-highway-safety-inspections/ highway-inspection-code-of-practice-april-2021.pdf

    If anything is identified as a risk during a future inspection, we will take action as appropriate.

    State changed to: No further action

    Posted by Cheshire East Council at 15:20, Tuesday 15 October 2024

This report is now closed to updates from the public. You can make a new report in the same location.