Alleyway behind 39 Electricity street crewe CW2 7EW

Reported via mobile in the Gully/Drainage category anonymously at 17:43, Tue 1 November 2022

Sent to Cheshire East Council less than a minute later. Council ref: 3930920.

The drain in the alley appears to have become blocked. With the recent rain it has completely blocked the alley off to the extent people are going to need wheelies to take their bins out. It is bringing silt up so there is a concern for the health of people having to walk through this. It spreads the entire width of the alley and across almost 3 houses in length. At the point this photo was taken it was as deep as the step into the back garden so risking flooding onto private land. This same drain appeared recently (about a month ago) to have had oil dumped down it which was visible from the swirled colours and the thick black sludge on the ground around it

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for contacting Cheshire East Highways. We have logged your enquiry and passed it to a member of our team.

    Our teams are working hard to manage and respond to reports from members of the public.

    We are currently experiencing an increase in demand of reported issues along with a temporary reduction in available staff due to Covid-related sickness and self-isolation.

    During this time and until the situation improves, we will be prioritising those issues that present most risk to the travelling public. While we normally aim to provide you with a response within 20 working days, response times for all other reported issues may take longer than usual.

    Thank you for your patience.

    Posted by Cheshire East Council at 17:43, Tue 1 November 2022

  • State changed to: In progress

    Updated by Cheshire East Council at 12:48, Wed 2 November 2022

  • We deal with defects based on the level of immediate risk. We have assessed the issue and it does not present an immediate risk to highway users at this time. As the problem you have reported is not causing an immediate safety issue we will now look at the best long- term approach for this location. We keep all roads and highway assets safe through our routine inspections. If anything is identified as a risk during a future inspection, we will take action to deal with it as appropriate.

    State changed to: No further action

    Posted by Cheshire East Council at 15:05, Wed 9 November 2022

  • State changed to: In progress

    Updated by Cheshire East Council at 11:39, Tue 15 November 2022

  • We have assessed your report and have arranged to carry out work as soon as possible.

    State changed to: Action scheduled

    Posted by Cheshire East Council at 11:41, Wed 16 November 2022

This report is now closed to updates. You can make a new report in the same location.