Gully/Drainage problem

Reported via Open311 in the Gully/Drainage category by Cheshire East Council at 15:47, Mon 1 June 2020

Sent to Cheshire East Council less than a minute later. Council ref: 2330503.

Caller advising that the ditch that runs along Plant Lane has been regularly filling up and flooding the road (both Plant Lane and Dragons Lane at the corner of these 2 roads). Caller advised that he has done some investigations of his own over the last 10 weeks and has found a gully on the corner that has been covered over with Tarmac (it has C.C.C. on the lid). He said it is totally solidified so open, but he advises that this will be completely filled with soil and debris which is causing the blockages/flooding. Caller has connected this gully to a new 6inch wide, 9mtr length pipe to the main drain, as there 2 fibreoptic tubes that were fitted by a company Fibreway which damaged the existing pipework. They have since gone out of business but the pipework has still been damaged. - JDS

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Your report has now been assessed and work is required. All work is planned and prioritised, you will be advised when the work required has been programmed.

    State changed to: Action scheduled

    Posted by Cheshire East Council at 16:10, Wed 7 October 2020

  • The work relating to your enquiry has now been programmed in accordance with our current priorities and will be completed in due course.

    Posted by Cheshire East Council at 13:13, Fri 9 October 2020

  • We are pleased to confirm that work is now complete and your report has been resolved. Thank you for contacting Cheshire East Highways

    State changed to: Fixed

    Posted by Cheshire East Council at 08:51, Wed 6 January 2021

  • State changed to: In progress

    Updated by Cheshire East Council at 11:33, Wed 6 January 2021

  • Your report has now been assessed and work is required. All work is planned and prioritised, you will be advised when the work required has been programmed.

    State changed to: Action scheduled

    Posted by Cheshire East Council at 13:48, Fri 8 January 2021

  • State changed to: In progress

    Updated by Cheshire East Council at 11:32, Mon 22 February 2021

  • Your report has now been assessed and work is required. All work is planned and prioritised, you will be advised when the work required has been programmed.

    State changed to: Action scheduled

    Posted by Cheshire East Council at 12:20, Fri 5 March 2021

This report is now closed to updates. You can make a new report in the same location.