Contact the team

You are reporting the following problem report for being abusive, containing personal information, or similar:

Towards the top of Artists Lane heading towards the Macclesfield road on the right hand side by the field gateway. There is a permanent drainage of ground water onto the carriage way. This has severely degraded the road surface down to to large aggregate. This is the first of a number of drainage problems on Artists Lane. The second is on the bend by Brynlow farm where the existing drainage from the right side (looking up Artists Lane) is not sufficient to carry heavy rainfalls which then heads down to Welsh Row. Further down Artists Lane below Flume Head cottage there has been excessive erosion of the left hand side of the road. There have been road cones marking this erosion for over 12 months now but no action to rectify. There was a road crew patching some pot holes on Tuesday 15/2/22 but quite frankly their efforts were pathetic and do not address the core reasons for erosion on Artists Lane (which is a Cheshire cycle route)

Reported by Michael G Rance at 18:34, Wed 16 February 2022

See above for issues at various locations on Artists Lane.

Topic:

optional

Prefer not to use the form?

You can contact us directly.